South Hartford Conveyance and Storage Tunnel

Construction Support Solutions was retained by Kenny-Obayashi Joint Venture to provide scheduling services for this project. The scope of the scheduling services included the development of the baseline schedule and monthly updates including reports. The scope of this project includes the construction of a new deep rock tunnel over 21,000 feet long and 18 feet in diameter. Beyond the tunnel, construction includes a tunnel launch shaft, pump station shaft, retrieval shaft, multiple drop shafts to pick up waste from surrounding neighborhoods, structures and gate chambers, stubs for future connections, odor control facility and other critical components for proper development.

Location: Hartford, Connecticut
Cost: $500 million
Services: Scheduling
Owner: Metropolitan District Commission