MILWAUKEE FEDERAL BUILDING

The U.S. General Services Administration (GSA) awarded Construction Support Solutions (CSS) a contract for the CMa/CxA Services for the Milwaukee Federal Building Fire Life Safety Project.  The building was constructed between 1892-1899 with additions throughout the 1930s and 40s, culminating in a stunning Romanesque style granite structure. This project intends to design and build a […]

Cuyahoga Valley National Park – Trail and Valley Railway Riverbank Stabilization

Construction Support Solutions has been selected to provide Construction Management Representative Services by the National Parks for the CUVA project. Thie scope of this project is to to stabilize the riverbank at high-priority areas along the Towpath Trail and Valley Railway in Cuyahoga Valley National Park, Ohio. The park, located south of the Cleveland metropolitan […]

U.S. Coast Guard Pier November USCG Base Charleston

SCOPE The initiative involves constructing new waterfront, shore structures, and utility facilities for berthing four National Security Cutters at Pier November. Tasks include demolishing and replacing the existing Pier November, removing contaminated soils, dredging between Piers Mike and Papa, and installing a new duct bank for C5IT connectivity. Our role extends to establishing a new […]

Kent State University Aeronautics & Engineering Building Addition

SCOPE Inaugurated in 2014, the Aeronautics and Engineering Building (AEB), formerly known as the Aeronautics and Technology Building, stands as a dynamic facility spanning 55,000 square feet. It currently houses classrooms, cutting-edge instructional and research laboratories, air traffic control simulation facilities, and essential academic administration offices.This project is to construct a 29,000-square-foot addition. This expansion […]

Ohio Department of Rehabilitation & Correction AOCI Pavement / Loading Dock at Allen Correctional Institution

SCOPE The comprehensive renovation project at the Allen and Oakwood Correctional Institution (AOCI) in Lima, Ohio, involved housing approximately 1,500 inmates. AOCI required extensive design and construction administration services for the planned renovations. The project scope included the replacement of road sub-base and pavement at various locations, such as Allen and Oakwood perimeter roads, Oakwood […]

Southwest Ohio Regional Transit Authority (SORTA) Facility Perimeter Control and Site Security for Garagend Maintenance Buildings

SCOPE The intent of this project is to enhance perimeter control and site security at three Cincinnati facilities: Access (1801 Transpark Drive), Bond Hill (4700 Paddock Road), and Queensgate (1401 Bank Street). Proposed security measures encompass electro-mechanical gates, fencing, and surveillance systems. At the Access Facility, the focus is on upgrading existing security infrastructure, including […]

Ohio Department of Natural Resources Dam Decommissioning and Wetland Creation

SCOPE Van Buren Lake is a reservoir created by the construction of Van Buren Lake Dam in 1939. A Class II (medium hazard) dam, Van Buren Lake Dam has exceeded its service life and decommissioning of the structure must be completed to meet dam safety regulatory requirements. Additionally, sediment, siltation, and excessive nutrients have accumulated […]

University of Akron Campus Hardscape – Buchtel Common

SCOPE This project involves the comprehensive renovation of Buchtel Common. Currently displaying signs of aging, the common requires a complete redevelopment to revitalize its functionality and aesthetic appeal. Playing a crucial role in connecting the campus internally and fostering links with the broader community, the redesigned corridor will prioritize enhancing these connections and creating a […]

Kent State University Ambassador Crawford College of Business and Entrepreneurship

SCOPE The project scope involves the construction of Crawford Hall, a cutting-edge facility for the Ambassador Crawford College of Business and Entrepreneurship at Kent State University. The groundbreaking ceremony took place in March 2022, marking the commencement of a $72.3 million initiative. This four-story, 158,400-square-foot building, designed by Perkins& Will and The Collaborative, serves a […]