Kent State University Aeronautics & Engineering Building Addition

SCOPE Inaugurated in 2014, the Aeronautics and Engineering Building (AEB), formerly known as the Aeronautics and Technology Building, stands as a dynamic facility spanning 55,000 square feet. It currently houses classrooms, cutting-edge instructional and research laboratories, air traffic control simulation facilities, and essential academic administration offices.This project is to construct a 29,000-square-foot addition. This expansion […]

Ohio Western Reserve National Cemetery Phase 3 Development

SCOPE This project involves the expansion and enhancement of a designated section within an existing cemetery site, demonstrating a commitment to precision, respect, and thoughtful design. This includes meticulous demolition and removal of existing structures, clearing of vegetation, and implementation of erosion control measures. Infrastructure improvement encompasses the construction of new roadways, repair of existing […]

Akron Northside Interceptor Tunnel

Scope: The Northside Interceptor Tunnel Project involves constructing a 16.5-foot diameter tunnel as part of the EPA-mandated Consent Decree, initiated in 2014 to improve the City’s sewer infrastructure and mitigate combined sewer overflows (CSOs). The tunnel, stretching 6,660 feet underground, will collect and store CSOs from four locations along the Cuyahoga River, effectively eliminating overflows […]

South Hartford Conveyance and Storage Tunnel

Construction Support Solutions was retained by Kenny-Obayashi Joint Venture to provide scheduling services for this project. The scope of the scheduling services included the development of the baseline schedule and monthly updates including reports. The scope of this project includes the construction of a new deep rock tunnel over 21,000 feet long and 18 feet […]

GCRTA On-Call Scheduling and Cost Review Services

Construction Support Solutions has been retained by the Greater Cleveland Regional Transit Authority (GCRTA) to provide On-Call Scheduling and Cost Review Services for a second term. Some of the current tasks under this contract include the Triskett Infrastructure Upgrades project and Tower City East Portal Rehabilitation project. CSS assists the GCRTA in monitoring the accuracy, […]

NASA GLENN RESEARCH CENTER – ACTIVE SCHEDULE MANAGEMENT RESEARCH SUPPORT BUILDING

This project is one of many projects underway at Glenn Research Center. The RSB will be roughly 64,000 square feet in overall size and will house 164 occupants, with a construction cost of approximately $31M. The building is being constructed on the site of the previously demolished Building 21 on the GRC campus. The new […]

NASA GLENN RESEARCH CENTER – AEROSPACE COMMUNICATIONS FACILITY

The scope of this project consists of the construction of a new 54,000 square-foot building in the West Area of  the  Glenn  campus,  tentatively  named  the  Aerospace  Communications  Facility  (ACF).    The  building consists  of  approximately  twenty  five  (25)  research  and  development  laboratories,  specialized  in  design  and  construction  for  communication  technologies.    The  building  and  grounds  include  […]

NASA – CRITICAL PATH METHOHD SCHEDULE ANALYST

CSS was recently retained by NASA to provide on-call scheduling services at the expert level. While this contract’s main focus is placed on the Upgrade LH2 System, LC 39B project, our team is also also be available to NASA for any additional scheduling services needed. As Critical Path Method Schedule Analyst (CSA), our team interfaces […]

NASA – REPAIR VEHICLE ASSEMBLY BUILDING (VAB) UTILITY ANNEX

The scope of this project includes the major renovations and replacements to the Motor Control Center at the Vehicle Assembly Building, along with a building addition to the Electrical Room. Replacement of 3,000 SF of the existing roof. This building is designed to assemble large space vehicles. Phased removal of existing chillers (peak load of 6,000 […]